B.TECH - Semester 7 software engineering and project management Question Paper 2019 (jul)
Practice authentic previous year university questions for better exam preparation.
Sample Questions
- Write short notes on the merits and demerits of spiral model.
- How QFD converts the needs of the customer into technical needs of the software?
- List the characteristics of a modular system.
- Differentiate verification and validation in the software development context.
- What is the role of Software Configuration Management. PART - B ( $\mathbf{4} \boldsymbol{\times} \mathbf{2 0} \boldsymbol{=} \mathbf{8 0}$ Marks) Answer one Full question from each module
- (a) Discuss with neat sketch any one incremental software development process model, which has shorter development cycle.
- (b) Elaborate the various phases of waterfall software development life cycle model with neat sketch. OR
- (a) Explain the prototyping model of software development with suitable diagrams
- (b) Discuss the liner sequential model and its pros and cons.
- (a) Explain with suitable examples, the significance of COCOMO model in estimating the effort to develop a project.
- (b) Explain the four approaches proposed by Putnam and Myer to estimate the size of a problem.
- (a) Discuss any two software size estimation techniques with suitable diagrams.
- (b) Elaborate LOC based estimation with an example application.
- (a) Describe in detail how the cyclomatic complexity helps to determine the logical complexity of the software.
- (b) Explain basis path testing with an example. Write the pros and cons of basis path testing. OR
- (a) Describe the following in detail.
- (i) Risk mitigation (ii) Risk monitoring
- (b) Enumerate the various control structure testing techniques.
- (a) What is earned value of a task? Explain the earned value analysis process, which is used to assess the progress of the software development task. (10)
- (b) Elaborate the user interface design process with suitable diagrams and examples. OR
- (a) Enumerate the role and contents of case repository.
- (b) Explain the timeline charts and project table methods of project scheduling with suitable examples.