B.TECH - Semester 7 software project management Question Paper 2019 (jun)
Practice authentic previous year university questions for better exam preparation.
Sample Questions
- Explain the characteristics of software.
- Give the merits and demerits of waterfall model.
- What is the differences between incremental and evolutionary process models?
- Explain process decomposition.
- Define software scope.
- What are the major risk components in software?
- What are the differences between LOC and function point estimation techniques?
- How is a task set defined?
- What is the relationship between people and effort in project scheduling?
- What is software reliability? (10) $\mathbf{\times 4} \boldsymbol{=} \mathbf{4 0}$ Marks) PART - B Answer one question from each Module.
- (a) Explain in detail the layered technology concept of software engineering. 8
- (b) What is an evolution any process model? Explain any one type of evolutionary model. 12
- (a) Explain in detail the capability maturity model integration (MMI).
- (b) Explain spiral model. What are the advantages of spiral model over waterfall model?
- (a) Describe the significance of project metrics and process metrics.
- (b) Explain the various software resources.
- (a) Briefly explain the major decomposition techniques.
- (b) Explain in detail about RMMM.
- (a) Discuss on :
- (i) Time line charts (ii) Earned value analysis. Illustrate each with a scenario. 12
- (b) Explain :
- (i) version control. (ii) change control. 8
- (a) Explain the SCM process in detail. 12
- (b) What are the major quality control activities? Explain how software quality is ensured.