B.TECH - Semester 8 industrial engineering Question Paper 2019 (nov)
Practice authentic previous year university questions for better exam preparation.
Sample Questions
- Define productivity.
- List our four objectives of value analysis.
- What are the various roles of an industrial engineer in an industry?
- Define method study and motion study.
- What is therbligs? Give two examples.
- What is trade dispute?
- What are incentives? List out some of the incentive schemes.
- What is MRPI List the various inputs for it.
- Write short note on quality circle.
- What is statistical quality control?
- What are the major reasons for low productivity? Describe some of the methods for improving productivity. OR
- (a) Explain the various phases of new product design and development.
- (b) Discuss the role of human-factors in design using suitable examples.
- (a) What is work measurement? Write down the basic procedure of undertaking a time study.
- (b) The ABC Company uses a standard data system to set time standards. One of the time study analysts listed the three work elements for a new task to be performed in the shop and then determined the normal time values to be $0.73 \mathrm{~min}, 2.56...
- (a) What is plant layout? What are needs for a good plant layout? Discuss various types of plant layouts.
- (b) Define Method study. What are its objectives? Discuss step by step procedure for method study.
- (a) Explain meaning and objectives of job evaluation. Discuss analytical methods of job evaluation.
- (b) What do you understand by collective bargaining? Explain concept of settlement of disputes. 20 OR
- (a) Explain the different type of industrial disputes in detail.
- (b) Explain about the objectives and various activities of production planning and control department.
- (a) Discuss the benefits to an organization in implementing total quality management.
- (b) Annual demand for window frames is 10000 . Each frame costs Rs. 200 and ordering cost is Rs. 300 per order. Inventory holding cost is Rs. 40 per frame per year. The supplier is willing to offer $2 \%$ discount if the order quantity is 1000 or mor...
- (a) Discuss the tools and techniques used in total quality management.
- (b) Explain the various quality costs.